Tender announcement

Focusing on wind power generation support structure systems

Proposed installation of 40 6.25MW wind turbines, bidding for National Energy 250MW wind turbines

Author:Golden Ocean CorporationViewers:685 Update time:2024-02-07

North Star Wind Power Network News: Recently, National Energy Group issued a bidding announcement for the procurement of wind turbine units (including towers) for the first phase 100 MW, second phase 50 MW, and Lixian 100MW wind power projects of Hebei Guoneng Hebei New Energy Development Co., Ltd. Guoneng Hengshui Anping.

Project Overview:

The site of the Guoneng Hengshui Anping Phase I 100 MW wind power project is located in the southwest of Anping County, Hengshui City, Hebei Province. It is planned to install 16 single unit 6.25MW wind turbines with a construction capacity of 100MW; The impeller diameter shall not be less than 200 meters, each section of the tower shall not exceed 25 meters, and the hub height shall not be less than 160 meters. A mixed tower shall be selected.

The site of the Guoneng Hengshui Anping Phase II 50 MW wind power project is located in the southwest of Anping County, Hengshui City, Hebei Province. It is planned to install 8 single unit 6.25MW wind turbines with a construction capacity of 50MW; The impeller diameter shall not be less than 200 meters, each section of the tower shall not exceed 25 meters, and the hub height shall not be less than 160 meters. A mixed tower shall be selected.

The 100 MW wind power project site of Guoneng Lixian is located in the southern part of Lixian County, Baoding City, Hebei Province. It is planned to install 16 wind turbines with a single unit capacity of 6.25MW and an impeller diameter of no less than 200 meters. The construction capacity is 100MW; The hub height of a single unit shall not be less than 160 meters, and each section of the tower shall not exceed 25 meters. A mixed tower shall be selected.

Scope of bidding:

The scope of procurement for the Guoneng Hengshui Anping Phase I 100 MW and Phase II 50 MW wind power generation projects includes 24 sets of ambient temperature wind turbines with a single unit capacity of 6.25MW (including steel hybrid tower procurement), with a total capacity of 150MW.

The procurement scope of the 100MW wind power project in Guoneng Li County includes 16 sets of room temperature type complete wind turbines with a single unit capacity of 6.25MW (including the procurement of steel hybrid towers), with a total capacity of 100MW. The impeller diameter shall not be less than 200 meters, each section of the tower shall not exceed 25 meters, and the hub height shall not be less than 160 meters.