中文字幕aⅤ在线播放-日本一区二区三区不卡在线观看-人人人人暴人人操,人人人人操人人人人操,人人人人操人人人人插,人人人人操人人人人爽,人人人人看人人人人操,亚洲国产,97超碰碰,97人人澡日韩乱码,欧美亚洲,一卡2卡三卡4卡 ,在线人妻无码中文一区二区,日韩日韩日韩日韩日韩日韩日韩日韩av,日本伦精品一区二区三区免费-高清欧亚非无码

Tender announcement

Focusing on wind power generation support structure systems

China Resources and Datang 610MW Wind Power Project Unit Start Bidding!

Author:Golden Ocean CorporationViewers:658 Update time:2024-02-22

North Star Wind Power Network News: On February 21st, a procurement announcement was issued for wind turbines and ancillary equipment for the China Resources Weichang Chaoyang 200MW project, China Resources Weichang West Longtou 200MW wind power project, China Resources Qinghe 300MW wind power project 150MW market-oriented project, and Datang New Energy Lulong Lunan 60MW wind power project, with a total scale of 610MW.

1.png

According to the bidding announcement, the China Resources Weichang Chaoyang 200MW project is located in Banjieta Town, Daobazi Township, and Longtoushan Town, Weichang County, Chengde City, Hebei Province. The installed capacity must be 200MW (not subject to capacity limitations), and the project consists of 32 wind turbines with a single capacity of 6.25MW. The total number of mixed exhaust models in the project cannot exceed 2. Delivery date/schedule: (1) Anchor bolts and anchor plate assemblies: to be delivered and completed on June 15, 2024; (2) Tower and wind turbines: The first batch of 8 sets of tower and wind turbines will arrive on August 15, 2024 (including all necessary lifting tools); The second batch of 8 sets will arrive on September 15, 2024; The third batch of 8 sets will arrive on October 15, 2024; The fourth batch of 8 sets arrived on November 15, 2024.

2.png


The CR Weichang West Longtou 200MW wind power project is located in Xilongtou Township, Nanshanzui Township, and Datoushan Township, Weichang County, Chengde City, Hebei Province. The installed capacity must be 200MW (capacity limitation is not accepted), and the project consists of 32 wind turbines with a single capacity of 6.25MW. The total number of mixed exhaust models in the project cannot exceed 2. Delivery date/schedule: (1) Anchor bolts and anchor plate assemblies: to be delivered and completed on June 15, 2024; (2) Tower and wind turbines: The first batch of 8 sets of tower and wind turbines will arrive on August 15, 2024 (including all necessary lifting tools); The second batch of 8 sets will arrive on September 15, 2024; The third batch of 8 sets will arrive on October 15, 2024; The fourth batch of 8 sets arrived on November 15, 2024.

3.png

The Huarun Qinghe 300MW wind farm project and the 150MW market-oriented project are located in towns such as Youfang Town, Xielu Town, Baying Town, and Wangguanzhuang Town in Qinghe County. The single machine capacity is 5MW, with 30 machine positions, and a total capacity of 150MW. Delivery date/schedule: Complete the supply of all anchor bolt components or other basic embedded parts (if any) before July 10, 2024; Provide the first batch of no less than 10 sets of wind turbines and towers by August 31, 2024; Provide the second batch of remaining wind turbines and towers by September 30, 2024; Provide the remaining third batch of wind turbines and towers by November 30, 2024.

4.png

The total capacity of Datang New Energy Lulong Lunan 60MW wind power project is 60MW, and no fluctuation is allowed. 5.5MW ≤ single unit capacity ≤ 6.25MW, and 1 unit is allowed to reduce capacity. The total number of units in this project is ≤ 10; Impeller diameter ≥ 200 meters, 115 meters ≤ hub height ≤ 140 meters; Accept mixed arrangement and limit steel towers. Delivery date: May October 2024.

*Some documents are sourced from the internet. If there is any infringement, please contact the website to delete them

湾仔区| 安平县| 营山县| 普陀区| 清苑县| 海盐县| 新沂市| 射阳县| 楚雄市| 辽阳市| 化州市| 泗洪县| 准格尔旗| 徐水县| 上思县| 澎湖县| 城固县| 西乌珠穆沁旗| 江川县| 阿鲁科尔沁旗| 赤水市| 专栏| 湛江市| 双辽市| 枣阳市| 岚皋县| 麦盖提县| 新河县| 苗栗县| 冀州市| 凤山市| 万州区| 丰城市| 阿拉善盟| 儋州市| 锡林浩特市| 体育| 天全县| 南郑县| 弋阳县| 鄄城县|