Tender announcement

Focusing on wind power generation support structure systems

EPC general contracting bidding for Inner Mongolia 60MW decentralized wind power project

Author:Golden Ocean CorporationViewers:505 Update time:2024-02-05

Recently, China Energy Engineering Corporation (CNEC) released a tender announcement for the general contracting of the 10MW decentralized wind power project in Wuchuan County and the 50MW decentralized wind power project in Wuchuan County.

Project Name: General Contracting of Wuchuan County 10MW Distributed Wind Power Project+Wuchuan County 50MW Distributed Wind Power Project.

Project Overview

The general contracting for the 10MW decentralized wind power project in Wuchuan County and the 50MW decentralized wind power project in Wuchuan County is carried out by Inner Mongolia Qingcheng New Energy Investment Co., Ltd. The project units are Wuchuan Yifeng New Energy Co., Ltd. and Qingcheng (Wuchuan) New Energy Co., Ltd. The bidding agency is China Energy Construction Group Tianjin Electric Power Construction Co., Ltd. This project has met the bidding conditions and is now open for bidding for the general contracting of the project.

2.1.2 Scope of bidding and division of sections (packages):

Section 1: 10MW Distributed Wind Power Project in Wuchuan County

Scope of bidding: This project includes land acquisition coordination, occupational health, and safety facilities handling for EPC general contracting projects such as wind farm engineering, wind power 35kV switching station, wind power 35kV switching station to Qingcheng (Wuchuan) New Energy Co., Ltd. Wuchuan County 50MW decentralized wind power project 110kV booster station 35kV side transmission overhead line, opposite side interval system, etc; Preliminary design report (including internal review by the bidder and review by the power company), etc; Survey and design, equipment procurement, construction, testing, grid connection, training, trial operation, acceptance, transfer of production and other EPC turnkey projects (excluding engineering construction supervision).

Section 2: Wuchuan County 50MW Distributed Wind Power Project

Scope of bidding: This project includes land acquisition coordination, occupational health, safety facilities and other preliminary procedures for EPC general contracting projects such as wind farm engineering, wind power 110kV booster station, and opposite side interval system; Preliminary design report (including internal review by the bidder and review by the power company), etc; Survey and design, equipment procurement, construction, testing, grid connection, training, trial operation, acceptance, transfer of production and other EPC turnkey projects (excluding engineering construction supervision).